Skip to main content
Metal Hawk completes drilling at Leinster South Project
Image for illustrative purposes only. Not a real photo.

Metal Hawk completes drilling at Leinster South Project

Share
  • Metal Hawk completed 1,642m of reverse circulation drilling at its 100% owned Leinster South Project in Western Australia.
  • Assay results returned 4m at 12.5 grammes per tonne of gold, sending company shares up to $0.12.
  • The exploration programme aims to establish a broader shear-hosted gold mineralisation system at the Numbat lode.

Metal Hawk (ASX:MHK) finished a 10-hole drilling programme at its Leinster South Project after receiving high-grade gold assay results.

The recent drilling returned a high-grade gold intersection of 4m at 12.5 grammes per tonne of gold from a depth of 43m.

"The new high-grade results from hole 26LSRC075 support our view that the Numbat lode is associated with a significant broader mineralised system at Thylacine and importantly, the intersection is interpreted to represent a new, shear-hosted style of mineralisation at Leinster South," said Metal Hawk Managing Director Will Belbin.

Laboratory assay results from the 1,642-metre drilling campaign are expected in approximately six weeks, with diamond drilling scheduled to begin in November.

Following the announcement, the Metal Hawk share price was up at $0.12.

In September 2026, the company raised $1.2 million in capital while initiating drilling at the high-grade target.

Metal Hawk continues to evaluate shear-hosted mineralisation across its Western Australian gold assets.


Frequently asked questions