
Jade Gas completes 2,642m multilateral gas well in Mongolia
Key points
- Jade Gas has completed what it says is Mongolia’s first multilateral coal bed methane well, ahead of its end-November target.
- Jade Gas shares were at $0.072 as at the time of reporting.
- The company said results from the well will help shape its development drilling programme planned for 2027.
Jade Gas (ASX:JGH) has completed what it says is Mongolia’s first multilateral coal bed methane well, drilling 2,642 metres through its target coal seam at Red Lake.
The well was finished ahead of the company’s end-November target, and has a main wellbore plus four branches drilled from a single surface location.
“Achieving 2,642 metres of contact with the target coal seam gives us a valuable opportunity to assess how greater reservoir exposure can improve well performance at Red Lake,” said Jade Gas Executive Director Dr Ian Wang.
About 93% of the well’s 2,841.6 metres of horizontal drilling was within the target coal seam, according to drilling contractor Yan’an Drilling Wellking Energy Technical Service.
Jade expects to start removing water from the new well and its two existing wells before the end of November 2026, a step needed before gas can flow. As at the time of reporting, the Jade Gas share price was $0.072.
The company said the multilateral design could increase the well’s drainage area, gas recovery and flow rates, which production testing will assess.
Jade operates the Tavantolgoi XXXIII coal bed methane project through a joint venture with the Mongolian Government, and gained approval for Mongolia’s first natural gas reserves in June 2026.
Frequently asked questions
More from Australia
Podium confirms 80% PGM recovery at Parks Reef
General Pants enters administration, 500 jobs at risk
Selling your rights in a capital raise? ASIC wants feedback
Challenger knocks back sweetened $8.2b TAL Daiichi offer
Waratah Minerals raises A$50m to grow Spur gold resource
Immuron hit with 44% first strike vote

