
Global Uranium and Enrichment (ASX:GUE) has announced the completion of its 2025 drill program at the Pine Ridge Uranium Project in Wyoming's Powder River Basin.
Conducted through the 50/50 joint venture Powder River Basin with Snow Lake Energy (NASDAQ:LITM), the program comprised 114 drill holes totaling 38,000 meters (125,000 ft).
Results confirmed widespread uranium mineralisation, defining at least 25 roll-front horizons across three major sandstone packages and extending the continuity of previously identified deposits.
Highlights include 2.6m at 0.101% U₃O₈ from 257.6 meters in PR25-093, 2m at 0.092% U₃O₈ from 314.8m in PR25-017, and 3.5m at 0.054% U₃O₈ from 321.3 meters in PR25-031.
Managing Director Andrew Ferrier stated, "The program confirms the presence of uranium mineralisation in multiple zones and supports further assessment and exploration across the Pine Ridge Project."