Skip to main content
Elementos starts 3,600m drilling at Cleveland tin project
Image for illustrative purposes only. Not a real photo.

Elementos starts 3,600m drilling at Cleveland tin project

By

Key points

  • Elementos has started a 3,600-metre diamond drilling program at its Cleveland tin and tungsten project in northwest Tasmania.
  • Elementos shares were at $0.36 as at the time of reporting.
  • The company said results will feed into a scoping study targeted for the first half of 2027.

Elementos (ASX:ELT) has started a 3,600-metre diamond drilling program at its Cleveland project in Tasmania, testing for tin, copper and tungsten.

The program, announced in October, will first test a tin-copper zone between two historically mined lodes that the company said has never been drilled.

“Our objective is clear: grow Cleveland’s tin, copper and tungsten Mineral Resources to support redevelopment studies,” said Elementos Managing Director Joe David.

Deeper drilling will then test the Foleys Zone tungsten target, estimated at 32 to 90 million tonnes at 0.17% to 0.24% tungsten oxide, though this is conceptual and not yet a resource.

Elementos said drilling results will feed into a Cleveland scoping study targeted for the first half of 2027. As at the time of reporting, the Elementos share price was $0.36.

Cleveland already holds resources of 7.47 million tonnes at 0.75% tin and 0.30% copper, plus 8.49 million tonnes at 0.24% tungsten oxide.

The company is also developing its flagship Oropesa tin project in Spain, and has an option to buy the Robledollano tin smelter there.


Frequently asked questions