Toro Energy (ASX:TOE) advances Lake Maitland Uranium Project for increased production potential
Business news

Toro Energy highlighted progress on the Lake Maitland Uranium Project extension study, assessing the integration of Lake Way and Centipede-Millipede deposits.
The study explores increased production potential at Lake Maitland, projecting 8Mlbs U3O8 and 11.9Mlbs V2O5.
A refresh of the 2022 Lake Maitland scoping study is underway to align with favourable commodity pricing.
The Wiluna Uranium Project's Wiluna, Lake Maitland, Lake Way, and Centipede-Millipede deposits contain 52 Mt at 548ppm U3O8 and 96.3Mt at 322ppm V2O5.
Exploration expenses for the quarter amounted to $1.07 million, focusing on Lake Maitland's development for long-term uranium production feasibility.