Tamboran Resources announced results from the Shenandoah South 1H well flow test in EP 117, Beetaloo Sub-basin in the Northern Territory.
The well achieved a 90-day initial production flow rate of 2.9 MMcf/d, normalised to 5.8 MMcf/d over 1,000m, setting a new record for the region.
The success validates Tamboran's strategy, with plans for a six-well drilling campaign to support a 40 MMcf/d Pilot Project in the Shenandoah South area.