Buxton Resources commenced drilling operations at its wholly-owned Graphite Bull Project in Western Australia.

The drilling program kicks off with two core holes aimed at testing the continuity, thickness, and grade of deeper mineralisation approximately 450m below the surface.

The first core hole will probe 300m below existing drilling, extending from intercepts in GB001RC (33m @ 18.7% TGC from 11m, 20m @ 18.3% TGC from 170m). The second core hole aims to test similar depths around 600m to the East.

A larger resource extension and infill drilling program is scheduled following the initial core holes.