Aeris Resources reported improved metallurgical test results for its Stockman Project in Victoria, highlighting enhanced metal recoveries and potential economic gains.
Improvements include copper recovery up to 92.0% (from 76.6%), zinc recovery up to 92.8% (from 68.9%), with gold and silver also increasing significantly.
The results support a streamlined ore processing design, lowering costs and emissions.
Plans include detailed test work and engineering for finalising processing plants, aiming to optimise copper and bulk concentrate production.