
Auravelle Metals (ASX:AUV) has reported high-grade gold intersections from its November 2025 RC drilling program at the Sheoak prospect, part of the Nuckulla Hill Gold Project in South Australia.
Highlights include 28m at 3.4 g/t Au from 48m, including 4 m at 12.7 g/t Au and 4m at 5.6 g/t Au, with mineralisation remaining open at depth.
Additional strong results include 8m at 2.2 g/t Au from 80m (including 4m at 4.0 g/t Au) and 16m at 1.3 g/t Au from 56m (including 4 m at 2.0 g/t Au).
The Sheoak gold trend has now been defined over at least 600m and remains open to the north, south, and at depth.
Auravelle Managing Director Andrew Muir said the results demonstrate the "significant potential of the system" and confirmed plans for multiple 2026 drill programs, including follow-up at Sheoak, first-pass drilling at the Skye Project, and regional programs near Crown in Western Australia.
Sheoak forms part of the highly prospective Yarlbrinda Shear Zone, which also hosts Barton Gold Holdings' neighbouring 1.6 Moz Tunkillia Gold Project.
At the time of reporting, Auravelle Metals' share price was $0.017.